Light
Dark

Construction Cost Analysis

Current Market Estimate
Current
₹ 0
Cost per sq ft: ₹ 0
₹ 0
Materials
₹ 0
Labor
₹ 0
Fittings
₹ 0
Vaastu
Adjusted Market Estimate
Adjusted
₹ 0
Cost per sq ft: ₹ 0
₹ 0
Materials
₹ 0
Labor
₹ 0
Fittings
₹ 0
Vaastu
₹ 0
Total Cost Difference
0%
Percentage Change
₹ 0
Per Sq Ft Difference
0
Months to Save Difference

Project Configuration

1 BHK 500-700 sq ft
2 BHK 800-1100 sq ft
3 BHK 1200-1500 sq ft
sq ft
5%
Market Trend: Prices Rising

Construction Timeline

90 days
Foundation 30%
Foundation (30 days)
Structure (45 days)
Finishing (60 days)
Handover (15 days)
30 days
Excavation & Foundation Work
45 days
Structure & Masonry Work
60 days
Plumbing, Electrical & Finishing

Vaastu Compliance

Copper Wiring

+ ₹12,000 • Enhanced safety & energy flow

NE Light Fittings

+ ₹8,000 • Positive energy attraction

Copper Pyramid

+ ₹5,000 • Harmonious vibrations

Salt Bowls (4 nos)

+ ₹2,000 • Negative energy absorption

Vaastu compliance adds approximately ₹27,000 to total cost

Fittings & Fixtures

Bathrooms

Standard: 2

-
2
+

Electrical Points

+15 per unit

-
15
+

Premium Fittings

+20% cost

Supervisor Required
₹/day

Labor rate per day (can be 0 for free labor)

0
Cement Bags
0
Steel (tons)
0
Bricks (1000s)

Price Matrix & Cost Analysis

Price Analysis
Current vs Adjusted Comparison
Material Unit Quantity Default Price Current Price Default Subtotal Current Subtotal Difference
Material Cost Total ₹ 0 ₹ 0 ₹ 0
Labor Cost Total ₹ 0 ₹ 0 ₹ 0
Fittings & Misc Total ₹ 0 ₹ 0 ₹ 0
GRAND TOTAL ESTIMATE ₹ 0 ₹ 0 ₹ 0

Material Requirements

6 materials
Material Waste Calculation
₹ 0

Based on 5% wastage factor. Adjust slider in Project Configuration.

Material Cost Distribution
0%

Percentage of total construction cost allocated to materials

Savings Optimizer

Best time to purchase: November-February (Off-season discounts up to 15%)
6-month forecast: Steel prices expected to rise 8%
Unlimited Pricing: You can set any price value (positive, zero, or even negative for special cases)